| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 3 Little BirdsRegistered · no quarterly update yet | Zenso Little Birds Projects LLP | Apartment | 724 sqft carpet (as filed) | Sep 2026 |
| Adarsh Palm Acres - Phase 1-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 1,604 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part AFiled as completed · no completion certificate on record | Bangalore Best Realty Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Bangalore Best Realty Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 9 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh Palm Acres - Phase 2-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 2-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 3,111 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres (Phase III)Active · 3% built | Adarsh Developers | Villa | 3,150–5,687 sqft | 2028 |
8 of 67 other projects in Bagalur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Special Housing Under "pmay" in the interactive atlas
Approval or registration
Khata issued
E Khatha · Revenue Department · Survey 200
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan 2/3/7/2022-2023
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/472/PR/171123/006414
K-RERA registration ·
Approval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 10 Jan 2022 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 200 | |
|---|---|---|
| Land extent, Sy 200 | 3Acre 35Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 13,354 sq m | |
| Khata | E Khatha · Revenue Department · 24 May 2021 | |
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 1 Aug 2022 · No. 2/3/7/2022-2023 | |
|---|---|---|
| Power NOC (BESCOM) | Not verified yet | |
| Fire NOC | building height 45 m (Tower 1, Tower 2, Tower 3, Tower 4, Tower 5, Tower 6) | Clear |
| Environmental clearance | SEIAA 72 CON 2021 · EC identification no. EC23B038KA110614 · issued 19 Apr 2023 | Clear |
| Airport height NOC | NOC ID BIAL/SOUTH/B/080721/566666 | |
| Pollution board (CFE) | consent order CTE-346736 · issued 31 Dec 2024 · valid until 18 Apr 2033 | Clear |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 1 Aug 2024 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 200 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
G+4 · avg 25 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| G+4 | 480 | 269 |
| Kumar Plumeria | about 2.5 km | Locked | |
|---|---|---|---|
| Assetz Sora & Saki Phase 2 | about 2.5 km | Locked | |
| Assetz Sora & Saki Phase 3 | about 2.5 km | Locked | |
| Adarsh Pinecourt | about 4 km | Locked | |
| Special Housing Under "pmay" This project | This project is the point the others are measured from | 1 Aug 2024 | Not filed | Not verified yet |
|---|---|---|---|---|
| Kumar Plumeria | about 2.5 km | 31 Dec 2028 | 5% (5 of 100) | Locked |
| Assetz Sora & Saki Phase 2 | about 2.5 km | 31 Jul 2029 | 38% (242 of 634) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 8 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 2 km, Ponnaiyar, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.00 (0 covered spaces for 2 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 29 Aug 2024 | |
| RERA completion date | 1 Aug 2024 | Red flag |
| Work began, as filed | 1 Aug 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 45 m (Tower 1, Tower 2, Tower 3, Tower 4, Tower 5, Tower 6) on the fire NOC · 14.95 m filed, 25 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 10.7 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | building height 45 m (Tower 1, Tower 2, Tower 3, Tower 4, Tower 5, Tower 6) | |
| Environmental clearance | SEIAA 72 CON 2021 · EC identification no. EC23B038KA110614 · issued 19 Apr 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost | ₹27.25 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · Gandhi Nagar | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 23 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 23 | Review |
| Complaints filed against the promoter | 4 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 10 Jan 2022 | Review |
| Building plan (BDA) | Sanctioned 1 Aug 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · Gandhi Nagar | |
| about 4.5 km |
| Locked |
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 4.5 km | Locked |
|---|
| Sobha Dream Gardens Phase 3 - Wing 3 And 4 | about 4.5 km | Locked |
|---|
| Assetz Zen & Sato | about 4.5 km | Locked |
|---|
| Radiance Floresta | about 4.5 km | Locked |
|---|
| The Pearl Paradise | about 5.5 km | Locked |
|---|
| Sattva La Vita | about 6 km | Locked |
|---|
| Tnm Lakeview | about 6 km | Locked |
|---|
| Assetz Sora & Saki Phase 3 |
|---|
| about 2.5 km |
| 30 Apr 2029 |
| 30% (92 of 304) |
| Locked |
| Adarsh Pinecourt | about 4 km | 6 Mar 2026 | 71% (142 of 201) | Locked |
|---|
| Sobha Dream Gardens Phase 5 - Wing 10 | about 4.5 km | 31 Dec 2028 | 97% (138 of 142) | Locked |
|---|
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 4.5 km | 31 Dec 2028 | 100% (364 of 364) | Locked |
|---|
| Projects within 4 km, counted | 17 (17 with an approximate location) | |
|---|---|---|
| Flats in them | 14,651 | |
| Booked | 11,100 of 14,651 (76%) | |
| Unsold | 3,551 | |
| Booked a month, pooled | 215 flats | |
| Months to sell, pooled | 13 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 2 km, Ponnaiyar, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 7 km, Bettahalasuru | |
| Kempegowda Airport | 9.5 |
| MG Road (CBD) | 18 |
| Manyata Tech Park | 10 |
| ITPL, Whitefield | 16.5 |
| Ecospace, Bellandur ORR | 21.5 |
| Electronic City Ph 1 | 31 |
| Landfill or waste transfer station | about 2.5 km to the west | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 1 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the north, named Bagalur Substation on OpenStreetMap |