Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 4 Square White PetalsLapsed · completion date passed | 4 SQUARE REALTY | Apartment | 883 sqft carpet (as filed) | Sep 2025 |
| Adarsh AstriaCompleted · OC 14-02-2024 | Adarsh Developers | Apartment | – | Completed |
| Adarsh PremiaExtended to 31-03-2027 | Adarsh Developers | Apartment | 2,050–3,720 sqft | – |
| Elegant TerracesLapsed · completion date passed | ELEGANT BUILDERS AND DEVELOPERS | Apartment | 1,412 sqft carpet (as filed) | Sep 2024 |
| Mamtha ParadiseActive · 68% built | mamtha dream works private limited | Mixed development | 744–891 sqft carpet (as filed) | Jun 2028 |
| Mars MountCompleted (regulator flag) | Mars Builders | Apartment | 2,112 sqft carpet (as filed) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 47 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 1 | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Mars The PlanetCompleted · OC 25-11-2025 | M/S MARS BUILDERS | Apartment | 787–1,639 sqft carpet (as filed) | Completed |
| Ncorp Skywalk LlpLapsed · completion date passed | NCORP SKYWALK LLP | Apartment | 848 sqft carpet (as filed) | Mar 2023 |
8 of 20 other projects in Banashankari, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open The Seven in the interactive atlas
Transfer of the land
Sale deed
Survey 51-39-60/1
K-RERA filing, land schedule
Approval or registration
Land use converted
DC BANGALORE URBAN DISTRICT · Survey 51-39-60/1
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Bangalore West City Corporation · Survey 51-39-60/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan GBA/BWCC/Addl.CTP/0007/25-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/270326/008558
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 15 Feb 2026 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | Arnya Real Estate Fund and Grit Wealth Investment Management Private Limited · ₹100.00 Cr disbursed | |
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: TS - BDA Sketch, 1 page.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 51-39-60/1 | |
|---|---|---|
| Land extent, Sy 51-39-60/1 | 14,872 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 14,872 sq m | |
| Khata | E Khatha · Bangalore West City Corporation · 16 Jan 2026 | |
| Sale deed | Dated 14 Jun 2007 | |
| Building plan (BDA) | Sanctioned 20 Feb 2026 · No. GBA/BWCC/Addl.CTP/0007/25-26 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/233/2025 · issued 29 Jul 2025 · building height 128.65 m | Clear |
| Environmental clearance | SEIAA 281 CON 2025 · EC identification no. EC25C3801KA5745263N · issued 14 Jan 2026 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 9 Jul 2025 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 1 Mar 2031 |
| Land conversion | Converted 8 Sep 2025 · DC BANGALORE URBAN DISTRICT | |
|---|---|---|
| Survey numbers | 51-39-60/1 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
| Transfer fee | 4% of the price | |
|---|---|---|
| Holding charge | Not verified yet | |
| Maintenance included | Not verified yet | |
4 BHK Apartment · avg 277 m² 50%4.5 BHK Apartment · avg 308 m² 50%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 4 BHK Apartment | 38 | 2,983 |
| 4.5 BHK Apartment | 38 | 3,316 |
| Sold, Q2 2026-27 | 62 / 76 | |
|---|---|---|
| Unsold, Q2 2026-27 | 14 | |
| Months to sell, derived from filed bookings | 1 months |
| Adarsh Premia | about 1.5 km | Locked | |
|---|---|---|---|
| Song Of Wind | about 3 km | Locked | |
| Sobha Royal Crest | about 3.5 km | Locked | |
| Vista Svara | about 4 km | Locked | |
| Garden Square | about 4.5 km | Locked |
| The Seven This project | This project is the point the others are measured from | 1 Mar 2031 | 82% (62 of 76) | Not verified yet |
|---|---|---|---|---|
| Adarsh Premia | about 1.5 km | 31 Mar 2027 | 55% (182 of 330) | Locked |
| Song Of Wind | about 3 km | 28 Feb 2026 | 63% (10 of 16) | Locked |
| Sobha Royal Crest | about 3.5 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, Vidyapeeta circle | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1 km, Yediyur Lake | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Community Hall · Gym · Water and Sanitation · Multipurpose Court · Virtual Golf · Spa & Salon · Indoor Sports Facility · BBQ Pit · MUGA Court · Kids Pool & Infant Pool · Reading Cabana · Poolside Bar · Outdoor Gym · Cricket | |
|---|---|---|
| Electricity, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Multipurpose Court, built | 0% | |
| Virtual Golf, built | 0% | |
| Spa & Salon, built | 0% | |
| Indoor Sports Facility, built | 0% | |
| BBQ Pit, built | 0% | |
| MUGA Court, built | 0% | |
| Kids Pool & Infant Pool, built | 0% | |
| Reading Cabana, built | 0% | |
| Poolside Bar, built | 0% | |
| Outdoor Gym, built | 0% | |
| Cricket, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 4.87 (370 covered spaces for 76 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | Not started · planned by 1 May 2029 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 21 Jan 2031 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 27% | |
| Completion, accountant | 20.5% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 5 Feb 2031 | |
| RERA completion date | 1 Mar 2031 | |
| Completion date, agreement | 31 Mar 2031 | |
| Work began, as filed | 16 Mar 2026 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 128.65 m on the fire NOC · 85 m filed, 2 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/233/2025 · issued 29 Jul 2025 · building height 128.65 m | |
| Environmental clearance | SEIAA 281 CON 2025 · EC identification no. EC25C3801KA5745263N · issued 14 Jan 2026 | |
| Architect, quarterly | Form 5 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | |
| Architect's certificate, registration | Dated 25 Feb 2026 · site inspected 20 Feb 2026 | |
| Engineer's certificate, registration | Dated 12 Mar 2026 | |
| Chartered accountant's certificate, registration | Dated 17 Mar 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹135.34 Cr 22.8%Development · ₹458.56 Cr 77.2%
| Estimated cost | ₹593.89 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹593.89 Cr | |
| Estimated cost, Form 4 Q1 2026-27 | ₹622.26 Cr | |
| Cost incurred | ₹127.56 Cr (20.5% of the estimate) | |
| Cost left | ₹494.70 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (62) 81.6%Unsold (14) 18.4%
| Sold, Q4 2025-26 | 0 / 76 · 76 available | |
|---|---|---|
| Sold, Q1 2026-27 | 58 / 76 · 18 available | |
| Sold, Q2 2026-27 | 62 / 76 · 14 available | |
| Unsold, Q2 2026-27 | 14 | |
| Sold in Q1 2026-27 | 58 | |
| Sold in Q2 2026-27 | 4 |
| Escrow bank | KOTAK MAHINDRA BANK · M G Road, Bangalore | |
|---|---|---|
| Designated account, collected | ₹31.01 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹31.78 Cr in Q2 2026-27 | |
| Withdrawn from the escrow account to date | ₹0 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | Arnya Real Estate Fund and Grit Wealth Investment Management Private Limited · ₹100.00 Cr disbursed | |
|---|---|---|
| Records searched to | 15 Feb 2026 | |
| Building plan (BDA) | Sanctioned 20 Feb 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · M G Road, Bangalore | |

| Pacific Legacy | about 6 km | Locked |
|---|
| Sumadhura Pramoda | about 6.5 km | Locked |
|---|
| Birla Tisya | about 6.5 km | Locked |
|---|
| Srivara Vasudha | about 6.5 km | Locked |
|---|
| Vista Padmalaya | about 7 km | Locked |
|---|
| Iris Courtyard | about 7 km | Locked |
|---|
| Mahindra Eden Phase-2 | about 7.5 km | Locked |
|---|
| 31 Dec 2028 |
| 100% (329 of 329) |
| Locked |
| Vista Svara | about 4 km | 30 Oct 2026 | 50% (16 of 32) | Locked |
|---|
| Garden Square | about 4.5 km | 30 Jun 2026 | 84% (193 of 230) | Locked |
|---|
| Pacific Legacy | about 6 km | 31 Dec 2025 | 20% (8 of 40) | Locked |
|---|
| Projects within 4 km, counted | 20 (20 with an approximate location) | |
|---|---|---|
| Flats in them | 2,637 | |
| Booked | 1,769 of 2,637 (67%) | |
| Unsold | 868 | |
| Booked a month, pooled | 27 flats | |
| Months to sell, pooled | 32 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 2 km, Jayanagar | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 33.5 |
| MG Road (CBD) | 6 |
| Manyata Tech Park | 14 |
| ITPL, Whitefield | 19.5 |
| Ecospace, Bellandur ORR | 12.5 |
| Electronic City Ph 1 | 16 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2 km to the north, named Kempabudhi Sewage Treatment Planet on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 1.5 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Padmanabha Nagar Substation on OpenStreetMap |