Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted |
|---|
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 52 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 1 | 2 | Review |
|---|
| Construction & progress | – | 1 | 1 | Review |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone IlluminaActive · 54% built | SRIVARI DWELLINGS | Apartment | 793–1,071 sqft carpet (as filed) | Dec 2028 |
| Amidst NatureExtended to 20-07-2027 | CLIMATE CONNECTIONS | Plot | ~1,500–2,800 sqft (estimate: filed carpet plus 25%) | Jul 2025 |
8 of 151 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open SLV Kingstone Valley in the interactive atlas
| Sale deed |
|---|
| Khata |
|---|
| Extent |
|---|
| Survey 2 | ||||
|---|---|---|---|---|
| 2/1 | 5 Dec 2016Deputy Commissioner | 20 Nov 2017in favour of SLV Housing Development Corporation | 20 Nov 20172Acre, 13Gunta · Revenue Department | 2Acre, 13Gunta |
| 2/1 | 30 Oct 2017Deputy Commissioner | 20 Nov 2017in favour of SLV Housing Development Corporation | 20 Nov 201725Gunta · Revenue Department | 25Gunta |
| 2/2 | 4 Feb 2023Deputy Commissioner | 3 Oct 2022 | 3 Oct 202217.08Gunta · Revenue Department | 17.08Gunta |
| 2/3 | 5 Dec 2016Deputy Commissioner | 23 Dec 2017in favour of SLV Housing Development Corporation | 23 Dec 20171Acre 3Gunta · Revenue Department | 1Acre 3Gunta |
| 2/3 | 15 Apr 2023Deputy Commissioner | 18 Apr 2023in favour of SLV Housing Development Corporation | 18 Apr 20235Gunta · Revenue Department | 5Gunta |
| 2/4 | 19 Jul 2024Deputy Commissioner | 18 Mar 2024in favour of SLV Housing Development Corporation | 18 Mar 202425Gunta · Revenue Department | 25Gunta |
| 2/5 | 16 Mar 2015Deputy Commissioner | 14 Dec 2016in favour of SLV Housing Development Corporation | 14 Dec 20161Acre,2.08Gunta · Revenue Department | 1Acre, 2.08Gunta |
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed executed
Consideration ₹2.13 Cr
Title deed filed with K-RERA, pp. 1, 7 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹10.0 L
Title deed filed with K-RERA, pp. 1, 5 · See it in Documents
Approval or registration
Building plan sanctioned
Kanakapura Planning Authority · plan KPA/LAO/231/2022-23/500
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/271025/008187
K-RERA registration ·
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 2 Jun 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 2/1,, 2/1, 2/2, 2/3, 2/4, 2/5 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Khata | 2Acre, 13Gunta · Revenue Department · 20 Nov 2017; 25Gunta · Revenue Department · 20 Nov 2017; 17.08Gunta · Revenue Department · 3 Oct 2022; and 4 more | |
| Sale deed | Dated 14 Dec 2016, 20 Nov 2017, 23 Dec 2017 and 3 more | |
| Sale deed in favour of | SLV Housing Development Corporation | |
| Title deed | Consideration ₹2.58 Cr · Sy 2/3, Gulakamale village, Bangalore South taluk | |
| Building plan (Kanakapura Planning Authority) | Sanctioned 20 May 2025 · No. KPA/LAO/231/2022-23/500 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Not verified yet | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 10 Sep 2026 |
| Land conversion | 7 of 7 parcels converted | |
|---|---|---|
| Sy 2/1,, 2/3 | Converted 5 Dec 2016 · Deputy Commissioner | |
| Sy 2/1 | Converted 30 Oct 2017 · Deputy Commissioner | |
| Sy 2/2 | Converted 4 Feb 2023 · Deputy Commissioner | |
| Sy 2/3 | Converted 15 Apr 2023 · Deputy Commissioner | |
| Sy 2/4 | Converted 19 Jul 2024 · Deputy Commissioner | |
| Sy 2/5 | Converted 16 Mar 2015 · Deputy Commissioner | |
| Survey numbers | 2/1, · 2/1 · 2/2 · 2/3 · 2/3 · 2/4 · 2/5 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
| Sattva Springs | about 2.5 km | Locked | |
|---|---|---|---|
| Harivishram | about 3 km | Locked | |
| Axis Amarissa | about 3.5 km | Locked | |
| Jhanavi Trishul Alaska | 7.0 km | Locked | |
| Sattva Forest Ridge | 7.7 km | Locked |
| SLV Kingstone Valley This project | This project is the point the others are measured from | 10 Sep 2026 | Not filed | Not verified yet |
|---|---|---|---|---|
| Sattva Springs | about 2.5 km | 18 Sep 2027 | 38% (25 of 66) | Locked |
| Harivishram | about 3 km | 31 Mar 2027 | 100% (152 of 152) | Locked |
| Axis Amarissa |
| Rent per sq ft, 3 km | ₹21.7 /mo, as listed · 5 listings with a size | |
|---|---|---|
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 400 kV, 190 m from the filed location | Clear |
| Nearest government-flagged flood location | 7.5 km, Mantri Lake view Appartment Next to Talagattapura Lake | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 740 m to the north, Suvarnamukhi, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 110 m to the north-east, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
As the promoter reported it

| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | 91.3% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 10 Sep 2026 | Review |
| Work began, as filed | 20 May 2025 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Engineer's certificate, registration | Dated 30 May 2025 | |
Land · ₹13.37 Cr 69%Development · ₹6.00 Cr 31%
| Estimated cost | ₹19.43 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹6.00 Cr | |
| Cost incurred | ₹17.74 Cr (91.3% of the estimate) | |
| Cost left | ₹1.69 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Union Bank of India · Girinagar, Bangalore | |
|---|---|---|
| Designated account, collected | ₹0 in Q1 2026-27 | |
| Designated account, withdrawn | ₹10.5 L in Q1 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 2 Jun 2025 | |
| Building plan | Sanctioned 20 May 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Union Bank of India · Girinagar, Bangalore | |

| Mahindra Eden Phase-2 | about 8 km | Locked |
|---|
| Platinum Landmark | about 8 km | Locked |
|---|
| Srivara Vasudha | about 8.5 km | Locked |
|---|
| Aqua Vista | about 10 km | Locked |
|---|
| Iris Courtyard | about 11 km | Locked |
|---|
| Garden Square | 11.2 km | Locked |
|---|
| Good Earth Cadence | 11.4 km | Locked |
|---|
| about 3.5 km |
| 31 Dec 2029 |
| 28% (23 of 81) |
| Locked |
| Jhanavi Trishul Alaska | 7.0 km | 30 Sep 2028 | 32% (47 of 148) | Locked |
|---|
| Sattva Forest Ridge | 7.7 km | 31 Dec 2029 | 75% (304 of 407) | Locked |
|---|
| Mahindra Eden Phase-2 | about 8 km | 30 Jul 2027 | 100% (250 of 250) | Locked |
|---|
| Projects within 4 km, counted | 8 (7 with an approximate location) | |
|---|---|---|
| Flats in them | 1,515 | |
| Booked | 609 of 1,515 (40%) | |
| Unsold | 906 | |
| Booked a month, pooled | 16 flats | |
| Months to sell, pooled | 58 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 7.3 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 740 m to the north, Suvarnamukhi, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 6.8 km, Silk Institute | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 48.4 |
| MG Road (CBD) | 21.1 |
| Manyata Tech Park | 29.1 |
| ITPL, Whitefield | 30.7 |
| Ecospace, Bellandur ORR | 21.7 |
| Electronic City Ph 1 | 16.9 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.3 km to the north-west |