Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | 1 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Abhigna's Misty WoodsCompleted · OC 23-03-2023 | ABHIGNA CONSTRUCTIONS | Apartment | – | Completed |
| Adarsh CitrineCompleted (regulator flag) | M/s Adarsh Developers | Apartment | 1,292 sqft carpet (as filed) | Completed |
| Adarsh Lake Reserva Phase 1Active · 0% built | M/s Adarsh Developers | Apartment | 893–1,292 sqft carpet (as filed) | Dec 2027 |
| Adarsh StratussLapsed · completion date passed | Adarsh Developers | Apartment | 2,380–2,515 sqft | 2027 |
| Arya Hamsa GrandeCompleted (regulator flag) | ARYA GRUHA PRIVATE LIMITED | Apartment | 1,111 sqft carpet (as filed) | Completed |
| Bhoomika HeritageCompleted · OC 15-11-2023 | B M R PROJECTS | Apartment | 850–1,049 sqft carpet (as filed) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 44 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | – | 1 | Clear |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Brigade Gardenia | Brigade Group | Apartment | 810–1,655 sqft | – |
| Brigade Millennium | Brigade Group | Apartment | 1,175–3,020 sqft | – |
8 of 37 other projects in JP Nagar, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Bhoomika Mayflower in the interactive atlas
Approval or registration
Land use converted
Special District Commissioner, Bangalore District · Survey 65/2
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Sy 65/2, Kembathahalli village, Uttarahalli hobli, Bangalore South taluk
Title deed filed with K-RERA, pp. 4, 45 · See it in Documents
Approval or registration
Khata issued
A Khatha · BBMP · Survey 65/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.Com/BMH/1485/24-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/290825/008040
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 27 May 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 65/2 | |
|---|---|---|
| Land extent, Sy 65/2 | 1A 38G | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 5,303 sq m | |
| Khata | A Khatha · BBMP · 7 Apr 2023 | |
| Building plan (BBMP) | Sanctioned 21 Jul 2025 · No. BBMP/Ad.Com/BMH/1485/24-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| Clearances pending | 2, in the latest update | Review |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2030 |
| Land conversion | Converted 5 Jan 2001 · Special District Commissioner, Bangalore District | |
|---|---|---|
| Survey numbers | 65/2 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 93 m² 95.7%2BHK 4.3%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 4 | 3,251 |
| 3BHK | 90 | 90,546 |
| Sold, Q1 2026-27 | 64 / 94 | |
|---|---|---|
| Unsold, Q1 2026-27 | 30 | |
| Months to sell, derived from filed bookings | 13 months |
| Platinum Landmark | about 0.5 km | Locked | |
|---|---|---|---|
| Aqua Vista | about 2 km | Locked | |
| Sattva Forest Ridge | 2.0 km | Locked | |
| Iris Courtyard | about 2.5 km | Locked |
| Bhoomika Mayflower This project | This project is the point the others are measured from | 31 Dec 2030 | 68% (64 of 94) | Not verified yet |
|---|---|---|---|---|
| Platinum Landmark | about 0.5 km | 30 Dec 2027 | 17% (18 of 103) | Locked |
| Aqua Vista | about 2 km | 31 Dec 2024 | 96% (173 of 181) | Locked |
| Sattva Forest Ridge |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 160 m from the filed location | Clear |
| Nearest government-flagged flood location | 1.8 km, BDA LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 130 m to the north, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 180 m to the north-east, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Community Hall, built | 30% | |
| Indoor Sports facility, built | 30% | |
| Gym, built | 30% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.11 (104 covered spaces for 94 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
As the promoter reported itPossession date in the agreement

| Main structure | 90% · planned by 31 Dec 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Dec 2029 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 74% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Dec 2030 | |
|---|---|---|
| Schedule end | 31 Dec 2030 | |
| RERA completion date | 31 Dec 2030 | |
| Work began, as filed | 15 Aug 2025 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 13.4 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026 (3 filed) | |
| Architect's certificate, registration | Dated 26 Jul 2025 | |
| Engineer's certificate, registration | Dated 26 Jul 2025 | |
| Chartered accountant, Form 4 | Dated 15 Jan 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹3.65 Cr 8.1%Development · ₹41.59 Cr 91.9%
| Estimated cost | ₹45.24 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹35.14 Cr | |
| Cost incurred | ₹33.42 Cr | |
| Cost left | ₹11.82 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (64) 68.1%Unsold (30) 31.9%
| Sold, Q3 2025-26 | 50 / 94 · 44 available | |
|---|---|---|
| Sold, Q4 2025-26 | 57 / 94 · 37 available | |
| Sold, Q1 2026-27 | 64 / 94 · 30 available | |
| Unsold, Q1 2026-27 | 30 | |
| Sold in Q4 2025-26 | 7 | |
| Sold in Q1 2026-27 | 7 |
| Escrow bank | Industrial Development Bank of India · SARAKKI LAKE | |
|---|---|---|
| Designated account, collected | ₹5.81 Cr in Q1 2026-27 | |
| Designated account, withdrawn | ₹5.96 Cr in Q1 2026-27 | |
| Amount deposited in the quarter, Form 4 | ₹7,51,68,653 | |
| Share of collections deposited in escrow | 100% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 27 May 2025 | |
| Building plan (BBMP) | Sanctioned 21 Jul 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · SARAKKI LAKE | |

Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sattva Forest Ridge, price locked; Lodha Azur, price locked.
| Lodha Azur | 3.8 km | Locked |
|---|
| Srivara Vasudha | about 4 km | Locked |
|---|
| Azur Tower D | 4.0 km | Locked |
|---|
| Jhanavi Trishul Alaska | 4.8 km | Locked |
|---|
| Azur Phase 2 | about 5.5 km | Locked |
|---|
| Garden Square | 6.0 km | Locked |
|---|
| Pacific Legacy | 6.1 km | Locked |
|---|
| Song Of Wind | about 6 km | Locked |
|---|
| 2.0 km |
| 31 Dec 2029 |
| 75% (304 of 407) |
| Locked |
| Iris Courtyard | about 2.5 km | 30 Jun 2026 | 30% (12 of 40) | Locked |
|---|
| Lodha Azur | 3.8 km | 30 Oct 2029 | 97% (236 of 244) | Locked |
|---|
| Srivara Vasudha | about 4 km | 30 Nov 2026 | 100% (95 of 95) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹45,000 /mo · 21 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹30,000 /mo · 35 listings | |
| Rent, 1BHK, 3 km | ₹11,500 /mo · 10 listings | |
| Rent per sq ft, 3 km | ₹28.4 /mo, as listed · 33 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 38 (22 with an approximate location) | |
|---|---|---|
| Flats in them | 10,572 | |
| Booked | 7,095 of 10,572 (67%) | |
| Unsold | 3,477 | |
| Booked a month, pooled | 219 flats | |
| Months to sell, pooled | 16 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 220 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 130 m to the north, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 2.6 km, Kalena Agrahara | |
| Kempegowda Airport | 40.6 |
| MG Road (CBD) | 13.5 |
| Manyata Tech Park | 21.5 |
| ITPL, Whitefield | 22.6 |
| Ecospace, Bellandur ORR | 13.7 |
| Electronic City Ph 1 | 11.2 |
| Landfill or waste transfer station | 1.2 km to the south-east | |
|---|---|---|
| Sewage treatment plant | 2.7 km to the north-east | |
| Quarry | 580 m to the south-west, named Anjanapura Quarries on OpenStreetMap | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.0 km to the north-west, named Khodays Glass Factory Substation on OpenStreetMap |